Advanced Roof Restoration — Roofing Contractor in Malaga

We are glad to greet you!

Advanced Roof Restoration

Roofing Contractor at Unit 2,21 Oxleigh Drive, Malaga WA 6090, Australia, Malaga, Western Australia, 6090 . Here you will find detailed information about Advanced Roof Restoration: address, phone, fax, opening hours, customer reviews, photos, directions and more.

Opening hours

  • Monday
    8:00 AM – 5:00 PM
  • Tuesday
    8:00 AM – 5:00 PM
  • Wednesday
    8:00 AM – 5:00 PM
  • Thursday
    8:00 AM – 5:00 PM
  • Friday
    8:00 AM – 5:00 PM
  • Saturday
    Closed
  • Sunday
    Closed

Rating

4
/
5
Based on 16 reviews

Contacts

Categories:
Region:
Western Australia
Address:
Unit 2,21 Oxleigh Drive, Malaga WA 6090, Australia, Malaga, Western Australia, 6090
City:
Malaga
Postcode:
6090

Photo gallery

Office photos Advanced Roof Restoration -->
  • Office photos Advanced Roof Restoration
  • Advanced Roof Restoration road map
  • Advanced Roof Restoration satellite image

About Advanced Roof Restoration

Advanced Roof Restoration is a Australian Roofing Contractor based in Malaga, Western Australia. Advanced Roof Restoration is located at Unit 2,21 Oxleigh Drive, Malaga WA 6090, Australia,


Please contact Advanced Roof Restoration using information below: Address, Phone number, Fax, Postal code, Website address, E-mail, Facebook. Find Advanced Roof Restoration opening hours and driving directions or map. Find real customer reviews and ratings or write your own review.


Are you the owner?
You can make a change to the company:
Edit this page

Reviews of Advanced Roof Restoration

  • Tyler
    Added 2016.09.30
    We feel the work in this area has detracted from the appearance of our house from our patio area and it is something that visitors comment on.
  • Sophia
    Added 2016.09.10
    The low point was probably two weeks in when a storm was due on the bureau of metrology forecast and they told me that they , as roofers, knew better and that it wouldn't rain and they didn't need to fit ridge capping to our roof. My husband had to go buy materials to climb on the roof to cover the fist size gaps to prevent the storm, that did come, damaging our house.
  • Landon
    Added 2016.08.28
    We had advanced roof repairs replace our tin roof. I wouldn't recommend them to anyone. They visited our house twice to quote us two to three days work.
  • Isaac
    Added 2016.07.11
    The work at the front of the house is of a good standard but work at the rear of the house is below par.
  • Nathaniel
    Added 2016.04.12
    The quality of work where pool heating was removed is poor, we were not told of a potential problem with tile damage and silicone marring the paint work here, or given the option to pay for extra tiles to avoid the problem. (Which we would have as it was apparently only another $500, a smallish sum considering out total outlay).
  • Alejandro
    Added 2015.11.15
    They started late because they hadn't organised the materials for our roof correctly.
  • Jason
    Added 2015.10.26
    In short do not accept verbal assurances regarding work to be done, ensure every little detail is written into contract.
  • Bria
    Added 2015.10.15
    Had a re roof from tile which was fretted and cracking terracotta to zincalume. Job was completed on time and the tradies were very informative and pleasant. Chris explained it the way it would happen and three days later I had a new roof. Mine was a simple roof being A frame and no gutters and downpipes though. Very happy with result and price.
  • Wyatt
    Added 2015.08.06
    Company director was approached, but appears unavailable to come out and look at the completed work that we are unhappy with, which is unfortunate.
  • Cole
    Added 2015.07.26
    In that time I made multiple phone calls to the owner, the guy doing the job and was completely unable to motivate them to finish.
  • Carter
    Added 2015.05.23
    The wider guttering and downpipes we were told we could have, were unavailable once contract was signed (the apparent ability to provide these was one of the main reasons we chose this company).
  • Robert
    Added 2015.02.21
    In fairness, seeing as contract had been signed, we settled with 4 extra downpipes at the same cost but it was not what we had wanted when we signed up.
  • Christian
    Added 2014.07.10
    Once they finally finished we had two leaks. We also had a different roofer fitting range-hoods tell us what a poor quality job they did.
  • Carlos
    Added 2014.07.04
    The guttering tradesman appears to have done good quality work.
  • Timothy
    Added 2014.04.21
    Once they did start they worked literally one to three hours per day. So the two to three days became six weeks.
  • Diego
    Added 2013.09.16
    Although most of the work was o.k, this company did not deliver what they promised.
Leave your own review about the company:
To curtail
Please rate: